Prepare Base
Excavate trench 200mm (8") deep and 400mm (16") wide. Place and
compact gravel to 100mm (4") depth.
|
|
Split Units
Split units apart using a hammer and chisel. Corner units must be
split in half as needed. Remove units from bundle and place near wall.
|
|
First Course
Place only standard units on gravel base. Ensure units are level from
back to front and from side to side.
|
|
Stack Units
Stack units along wall. Coping units can be used in the wall, but
should not be stacked on other coping units without adhesive.
|
|
Placing Coping
Place a line of adhesive in front of and behind the tongue on the second
last course. Position coping stones on top.
|
|
Finish Wall
Fill with compacted soil to top of the wall.
|